Machine a replacement pump shaft on the lathe
You are a machinist at the Wodonga machining centre.
What has happened
Kestrel Water Corporation have a split case pump out of service and have ordered a replacement shaft under job card JC-26-0415 to drawing KW-P17-03 rev A. The 4140 grade round bar arrived under receipt REC-26-0882 with its certificate on file. The shaft has two bearing journals with close tolerances, a keyway, a thread at the drive end and specified surface finishes. The horizontal borer is tagged out of service, so all work must be planned for the CNC lathe and the mill. Tan Nguyen, the Machine Shop Supervisor, wants the shaft finished, measured and reported by 22 September so the customer's fitters can rebuild the pump.
Deliverables
- Written machining sequence with tooling and speeds and feeds
- Job Safety Analysis for the lathe and mill work
- Inspection report with measured values against every toleranced dimension
- Updated job card JC-26-0415 with hours and status
Documents to use
- Job Card and Work Order Procedure Procedure
- Job Safety Analysis Template
- Quality Policy Policy
- Material Receipt and Traceability Procedure Procedure
Systems to use
Job Card Register
Tracks every fabrication, machining and maintenance job from quote to close-out with customer, drawing, hours and status.
Plant and Equipment Register
Lists workshop machines, cranes, welding sets, measuring equipment and site tools with inspection, calibration and service status.
Materials and Certificate Register
Records receipts of steel, consumables and spares with purchase order, heat number, certificate reference and the job each item was issued to.
Units of competency
Current on training.gov.au for the Manufacturing and Engineering as at 10 September 2026.
MEM07006Perform lathe operationsMEM07007Perform milling operationsMEM09002Interpret technical drawingMEM12001Use comparison and basic measuring devicesMEM07001Perform operational maintenance of machines/equipmentMEM13015Work safely and effectively in manufacturing and engineeringQualifications
MEM30219Certificate III in Engineering - Mechanical TradeMEM30119Certificate III in Engineering - Production SystemsWhat to look for
Evidence guide
Evidence should show a logical sequence that machines the journals last with a finish cut, correct speeds and feeds for 4140, and measurements recorded with the instrument identified and in calibration. Check that the student verified the equipment register before use, noted the borer was out of service, and that the inspection report would let the customer accept the shaft without re-measuring. Observe safe chuck, guard and swarf practice.